Good Deal PicksDeals for the United States
Search
Product guide

Work Breakdown Structures: The Foundation for Project Management Excellence

Work Breakdown Structures: The Foundation for Project Management Excellence explains how to develop and use a work breakdown structure throughout a project. It covers scope definition, planning, execution, monitoring, control, and closeout, with a real-life project example described throughout.

At a glance

  • Explains WBS background, core characteristics, decomposition, representations, and tools.
  • Connects WBS use with project initiation, scope, contracts, and Statements of Work.
  • Covers procurement, financial, quality, risk, resource, and communication planning.
  • Follows the WBS from project execution and control through closeout, using a real-life project example.
Price
$53.99Save 45%

Reference price: $98.95

Price checked: Nov 14, 2026

View offer

Pros and cons

Pros

  • The subject matter spans the project life cycle rather than treating WBS as only a planning document.
  • The example is described as showing how the WBS shifts from gathering project information to supporting decisions, control, and measurement.
  • Includes both deliverable-based and activity-based management topics.

Technical specifications

9 specifications
Publication details
PublisherWiley
Publication dateOctober 6, 2008
Edition1st
LanguageEnglish
Print length304 pages
ISBN-100470177128
ISBN-13978-0470177129
Dimensions and installation
Weight listed1.2 pounds
Dimensions6.4 x 0.8 x 9.55 inches

Who is it for?

A good fit for

  • Project managers seeking a focused reference on building and applying work breakdown structures.
  • Readers who want WBS-related guidance across scope, planning, procurement, risk, control, and closeout.

Customer reviews on Amazon

4.6 / 5 · 14 ratings
  • 5 stars68%68%
  • 4 stars26%26%
  • 3 stars6%6%
  • 2 stars0%0%
  • 1 star0%0%

Aggregate customer ratings lean positive, with most ratings in the top two star categories and a smaller three-star share. No written review details are supplied, so the ratings cannot show which topics readers valued or what concerns they had. For buyers considering this focused WBS reference, treat the rating pattern as a limited general signal rather than evidence about coverage or practical results.

Frequently asked questions

What does this book cover?

It covers WBS concepts and development, project scope, planning, procurement, risk and resource planning, execution, monitoring, control, and closeout.

Does it use a project example?

The listing says a real-life project is used throughout to illustrate the WBS from initiation and planning through execution and project control.

What publication details are listed?

The listed edition is the 1st, published by Wiley on October 6, 2008. It is in English and has 304 pages.

Alternative options

Products with discounts that might interest you

4.7
The Story of Art Without Men
The Story of Art Without Men

$45

$25.48

-43%
-43%
Product details in Markdown